Scates Construction will provide the owner with as-built drawings, operations manuals, and warranties (should be provided no later than two weeks after building department’s final inspection). Meet with Owner and Architect to review our job performance. Determine what should be done differently on next project. Project Manager to maintain contact with the Owner and Architect on a regular basis. Conduct a 11-month walkthrough to identify items requiring repair, or replacement under project warranties.